Our system does not have failure codes set up, as they were tracked differently. Where would be the optimal location to enter failure codes on the work order in MP2ACCESS2000?
Hey Jim, have you activated the failure analysis feature in MP2? To confirm, click on Tools/Setup/Workorders and look for the option labeled "enable failure analysis". Make sure you are logged in as the system admin to view it. Once this is set up, you will be able to input the "reason for outage" in the work order. I hope I addressed your query correctly. On a separate note, I find it frustrating how MP2 mandates defining a RFO for each equipment item.
Thank you, that was precisely the information I needed. This answer perfectly aligns with my search query and provides the exact details I was seeking.
Answer: - If failure codes are not set up in the system, you can consider entering them in a custom field or a designated notes section on the work order in MP2ACCESS2000.
Answer: - Yes, if failure codes are currently tracked differently, you can create a specific section or field within the work order in MP2ACCESS2000 to capture and track the failure codes separately.
Answer: - Yes, you can customize the work order template in MP2ACCESS2000 to include a dedicated field for entering failure codes. This customization can help streamline the process of tracking and managing failure codes within the system.