I have been using Studio5000 version 35 without any issues, but today I am encountering a problem when trying to open it. An error message is displayed stating that the afutil.dll file cannot be found. If you have any suggestions on how to resolve this issue, please assist me.
Before considering re-installing, there are a few troubleshooting steps you can take. First, try performing a repair using the system apps menu in Windows. Additionally, make sure to run the latest patch released monthly on the RA website. Please note that there are no guarantees that either of these methods will resolve the issue.
Last week, I encountered difficulties regarding a message that initially made me believe the issue stemmed from corrupted module profile files. However, upon further investigation, I discovered that the problem was related to resources. For a detailed look at my troubleshooting journey, refer to my recent post on the forum: "Logix Designer v35.1 unable to edit module profiles (5580 - L83e - Flex5000)." Additionally, user jstolaruk provided valuable insights. During a conversation with a Rockwell Automation technician today, I learned that the memory usage of Logix Designer has been a key focus for the company in the past year. The release of version 36.1 reflects their commitment to improving this aspect. When you resume your work, upgrading to V36.1 may prove beneficial in preventing similar issues in the future.
Answer: The error message indicates that a necessary file, afutil.dll, is missing or corrupted, leading to the software's inability to open properly.
Answer: To resolve the afutil.dll error, you can try reinstalling Studio5000 version 35 or repairing the installation to ensure all necessary files, including afutil.dll, are properly installed.
Answer: Yes, you can try performing a clean reinstall of Studio5000 V35, updating your system's drivers, running a malware scan to rule out any malicious software affecting the file, or restoring the missing afutil.dll file from a backup or a reliable source.
Answer: Reinstalling Logix Designer V35 may resolve the issue if the error is due to a missing or corrupted afutil.dll file. However, it's recommended to backup your project files before reinstalling to avoid any data loss.