Is it possible to set upper and lower limits for measuring points in SAP and have the system automatically trigger a work order if a reading exceeds these limits, possibly through the use of the preventive maintenance system?
Can you clarify what you mean by exceeding the specified limits? Could you provide some examples for better understanding? For instance, if the range is set between 1 and 10 but the measurement falls below 1 or above 10, is this what you're referring to in your inquiry?
Looking for resources to set up alarms in SAP for user processes? Check out the following links for detailed instructions and guidance: - http://help.sap.com/businessob...rocess_a_user_en.pdf - http://help.sap.com/saphelp_mi...0a11466f/content.htm - http://help.sap.com/saphelp_47...2326d51/frameset.htm These resources can help you effectively monitor and manage alarms in your SAP system.
For instance, if a pressure regulator is set to 100psi and needs to be controlled within a range of 5 psi plus/minus, you can establish a measuring point with high and low limits of 105 and 95, respectively. The readings may fluctuate, but any measurement exceeding 105 or falling below 95 will trigger a warning in SAP. I am wondering if SAP has a mechanism in place to automatically generate a work order in response to such warnings.
Is it necessary for your CMMS to be integrated with your DCS to establish low and high setpoints? This integration allows operators to identify and address process parameter deviations during their daily walkarounds. Are your operators trained to spot these deviations and create work orders accordingly?
Hello, I am in need of SAP training materials. Could you kindly send them to me at mnewiraq2000@gmail.com? Thank you.
Answer: 1. Can we set upper and lower limits for measuring points in SAP? - Yes, it is possible to set upper and lower limits for measuring points in SAP using the configuration settings.
Answer: - Yes, SAP allows for the automatic triggering of work orders when a reading exceeds the specified limits for measuring points, utilizing the preventive maintenance system.
Answer: - You can configure SAP by defining the upper and lower limits for measuring points and setting up the necessary parameters to trigger work orders when these limits are exceeded, ensuring efficient maintenance management.